Coatings
Description
PVD coating system metalizing coating?Is a comprehensive vacuum equipment manufacturers and service providers,
has automatic vacuum coating machine, vacuum coating equipment and other
products, has more than 10 years the accumulation of vacuum coating technology,
its advanced coating equipment, including high evaporation coating systems, ion
plating, magnetron sputtering coating system, laser sputtering deposition
system, wired coating production line is merged into the dominant etc series
products.?If you interested in vacuum coating systems please let me know below:1) you want to plating chrome on what products ?2.) estimated that how many pcs per day you do coating ? how many hours you work per day ? 3) what is the dimensiion of your products ? the same size , if not the same, please tell me the maximum/minimum dimension. 4) your product material ? 5) any other special requirements ?UV plating PVD coating line?The process flow1. Surface treatment: usually, before coating, dealing with the base material (plating) for oil removal, dust removal, such as pretreatment, to ensure a clean, dry plating, avoid bottom coating appeared pitting, poor adhesion shortcoming.For special materials, such as PE (polyethylene) materials, etc., also deal with the modification and coating in order to achieve the desired effect.2. The bottom coating, surface coating: coating construction, automatic spray can be used, also can use artificial spraying and dip coating, specific should see plating pieces of size, shape, structure and user equipment and other specific conditions and the quality requirements of the customers.3. The bottom paint drying: drying in order to improve production efficiency.Often the drying temperature is 60-70 ℃, about 2 hours.Baking finish the requirement of paint film is completely dry.4. The surface coating drying: in a relatively thin bottom coating surface coating, so the drying temperature is low, the user can flexibly according to actual condition, fi
Read More
Shenzhen Heng Yi Automation Equipment Co.Ltd
Key Word
Address: No.2 Xin Fa Western Road, Xin Fa Industrial Zone, ShaJing, BaoAn District Shenzhen China,
shenzhen, guangdong
China, 518101
Tel: 86-0755-29933386
Fax: 86-0755-29933389