Wires, Cables & Cable Assemblies
Description
6000K Cool White G10 Base LED 9W PL Lamp 850lm 110V , 80Ra CRI
?
Specifications:
?
- - - -
Part?Number: | TECH-PLD-1009AG10 |
Input?Voltage: | AC?100~277V?50/60Hz |
Power?Consumption:? | 9W |
Light?Source: | SMD?LEDs? |
Luminous?Flux: | 850lm? |
Color?Temperature: | 3000K?(Warm),?4500K?(Neutral),?6000K?(Cool) |
CRI: | 80?Ra?(Typical) |
Construction: | Aluminum;?PC? |
Physical?Dimensions: | ¢48mm*150mm |
Base: | G10q?/?G24 |
Remark: | Compatible?with?ballasts |
- - - -
?
- - - -
Characteristics: |
1:??Compatible?with?electronic?ballast?(no?re-wiring?needed);
2:??Can?be?plugged?in?directly?without?removing?and?rewiring?or?bypassing?the?electronic?ballasts;
3:??Can?work?in?AC?100~277V?directly;
4:??UL?certified; |
Instructions: |
1:?You?just?need?to?plug?the?G10?LED?PL?lamp?into?an?existing?fixture?with?no?rewiring?no?cutting?of? wires?just?plug?them?in?and?they?will?work.
2:?If?you?use?with?ballast?and?ballast?dies,?then?you?can?remove?ballast?and?reuse?the?tubes. |
Installations: |
1:?For?retrofit?project,?you?don’t?need?to?remove?ballast?until?ballast?fails,?then?you?just?remove? ballast?and?reinsert?G10?LED?PL?lamp,?it?will?work?without?ballast.
2:?For?new?installation?project,?you?can?just?install?the?G10?LED?PL?lamp?without?any?ballast,? just?direct?wiring?to?the?lighting?fitting?at?100-277?Volts?AC.
? |
- - - -
?
Trade terms:
?
1. Production Time: 7-12 days.
?
2. Shipping by express (TNT, DHL, Fedex, UPS, EMS etc) or Aircargo..
?
3. Shipped to Worldwide.
?
4. Payment: T/T, Paypal, WestUnion, etc.
?
5. 100% quality guaranteed.
?
6. Package: Standard Export package for long-distant ocean shipment and tough handling.
?
Production process:
?
1. Professional sales and egineer communication before order.
2. Advanced technology, exquisite workmanship, top design.
3. Strict quality check for each part, each process before export.
4. Optimum system solution based on each clients specific requirement.
5. Complete post-sale service, including installation, technical guide and training.
?
Lead Time:
?
1. For sample order: usually 3-5 working days.
?
2.?For bulk order: usually 7-12 working days.
?
Mass Production:
?
Read More
Previous
Retrofit G10 LED PL Lamps For Street Light , 7 Watt Led PL Light Bulb...
Shenzhen Techled Optoelectronics Co., Ltd.
T8 LED Tube Light,Dimmable Led Tube Lights,SMD LED Tube Light
Address: Silicon Valley High tech Industrial Park,
Shenzhen, Guangdong
China, 518000
Tel: 86-755-27535866
Fax: 86-755-27535766