Industrial Batteries
Description
?
?
Thick Insulation Sandwich Panels PU Injection Machine 380V / 50hz
?
?
Applicable products:
?
1. PU Shoes, memory pillows, and soles
2. Simple?operation
3. bulk?supply
4. factory price
5. soon delivery
6. sample available
7. customer design can be done
8. high quality and reliability
9. auto / manual operation systems?
10. convenient maintenance
11. Overseas service available.
?
?
Technology Parameters:
?
- - - -
pouring machine model | HC-201?High Pressure Polyurethane Foaming Machine? |
Tank quantity | 5 |
Tank capacity | 140L |
Pump quantity | 4 |
Speed of pump(r/min) | 0 -280 |
Precision (%) | ?± 0.1 |
Clean the head | Auto/By hand |
Voltage | 380V |
power | 20(kw) |
output | 70(k/s) |
Clean quantity | 4500(r/min)>25,9000(r/min)>160 |
Clean materials | no need cleaning agent. DOP is used only for?material changing. |
- - - -
?
?
?
Operation condition:
?
1.?Latest configuration?system?and?friendly maintenance.
2. Making safety shoe, leisure shoe, casual shoe, sandal, etc in double density.
3. Suitable for direct soling injection of single PU or colorful PU.
4. Each injection unit is equipped with two colors with accurate measurement of painting.
5. Automatic cleaning
6. Low noise and low energy consumption
7. Stable rotation and accurate positioning.
8 High mold clamping force.
9. Independent PLC control for each station with multi-function.
10. any colors can be made.
?
???????????????????????????????????? ? ? ? ? ? ? ? ? ? ? ? ? ? ??
?
Control system:
?
1, With the state of the art computer controlled system to gain the machinery more efficiency and reliability.
2, Self-diagnosis, alarming and monitoring functions and multi-language alternatives.
3, Preset technical parameters.
4, Reserve electrical interface for mechanical arm
5, PID closed-loop and self-regulated injection program
6, Automatic PID temperature control
7, Emergent halt protection device.
?
?
Specifications
Two color and three color available?
It & acute;s used for making safety shoe, leisure shoe, leather shoe/sole, etc.
1, On the turning circularity molding line which is mould-frame of horizontal multi-position, there are all kinds of specification and model moulds of sole and upper-link molding. When molding line runs equably and circularly, the pouring head of polyurethane foame machine or polyurethane pouring molding two purpose machine pour mix material liquid into the moulds continuously, after the material liquid processed molding in the moulds, which make many kinds of eligible molding shoes or soles.
2, Equipments productivity?
polyurethane foam machine matches with sole molding molding line(60 position or more), we produce polyurethane soles by 50 shoe moulds, 10 hours one day and 8 circles/hour, as the rotating speed, it can yield 4000 pairs of soles per day.
3, Polyurethane foamed machine matches with sole upper-link molding production line(60 position), we are produce 10 hours one day and 8 circles/hour, as the rotating speed, it can yield 1200 pairs of soles per day.
4, Double color, double density polyurethane sole or upper-link molding shoe products, this techniques should be second pouring, so productivity will be decline
?
?
HC-201 series PU foam injection?machine is?ideal shaping equipment to produce world class leather shoes, leisure PU memory pillows, seat cushions, sports shoes etc. Its performance has reached the same level of foreign competitive products and can fill in the very domestic blank.
?
?
FAQ:
?
1.?How?long?will?your?engineer?reach?our?factory?
? ? Within?one?week?after the machine?arrived at?your?factory.
?2.?How?many?days?will?you?finish?installing?
? ?For low pressure and high pressure injection machines, 10?days will be enough for our technicians to
? ?complete the equipment installation, erection, start-up commissioning and personnel training.
?? For PU molding machine, mold carriers, and sandwich panel production lines, 25 to 30 days are
? ?necessary for our technician to complete the assembly,?installation, erection, start-up commissioning
? ?and personnel training.
?3.?What?would be charged for?your?engineers to install and train our people at oversea plant?
? ? ?Usually are the?costs invoving in the asigned ngineer& acute;s?visa,?air?tickets,?acommodations,?
? ? ?and?their?salary.?It is our policy to charge USD?150 per capita per?day.
?4.?How?long?is?your?machine& acute;s?warranty?period?
? ? All?our?machines are with?one?year?guarantee,?starting?from the date of completing the commissioning.
?5.?How?could?we?do?after?one?year?warranty?period?
? ? We?also?can?do?service?for?you,?but?you?need?pay?salary?for?my?technician?80USD/day.
?6.?What should?we?do?if?the?parts?broken?within?warranty?
? ?We?would?express?the?free?replacement?parts?during?the?warranty?date.
?7.?Does?your?engineer?understand?English?
? ?Our?engineers?understand?a?little?English.?All?of?our?engineers have?more?than?five?years?mechanical
? ? installation?experience.?In?addition,?they?can?use?body?language?to?communicate?with your people.
?8.?Can?you?help?us?find?any?engineer?in?our?location?
? ? Of?course,?we?will?check?and?inform?you?as?soon?as?possible.
Read More
HuizhouHeChen Mechanical Equipment Co.,Ltd.
PU Injection Machine,Polyurethane Foam Machine,High Pressure Foaming Machine
Address: Huahan Tech. Industry Zone,
Shenzhen, Guandong
China, 518000
Tel: 86-752-3766356
Fax: 86-752-3766357