Construction Machinery

Share us

Cement Vertical Mill

Cement Vertical Mill

Description

The main structure and function of Cement Vertical Mill:

Grinding roller is the main components for materials rolling and grinding. Mill is equipped with two pairs of grinding roller, each pair of grinding rollers mounted on the same axis with different rotating speed. Disc of grinder is fixed in the output shaft of reducer and upper part of the disc is the material bed which has annular groove. PRM-type vertical mill is composed of the separator, roller disc, compression device, reducer, motor, shell and other parts. The separator is an important component to decide fineness and it is made up of adjustable speed gear, rotor and guide blades, shell, meals off the material cone hopper, the outlet. The working principle is similar to powder concentrator machine. Pressure device is to support the components so called grinding pressure and the composition mainly contains the high-pressure filling stations, hydraulic cylinder, lever and storage, etc., exert enough pressure to make the material grinding to the grinding rollers.

Working principles of Cement Vertical Mill:

Materials in the air flow go through the separator by the role of guide vanes and rotor, the crude material from the cone bucket on to the disc. Fine powder with a mill with the air ca be collected in the collecting device in the system that product materials are dried and gas contact process to reach the required water, adjust the angle of the wind guide blades and the separator rotor speed can achieve different fineness of products.

Motor is driven by reducer to reduce the rotation speed. The existing hot air from the air inlets into the mill and the material falls from the feed opening disc central; Due to the centrifugal force, materials move to the disc edge, through the annular groove on the disc by the grinding roller RCC and grinding, continue to move to the disc edge, until brought up the airflow at the wind. The large particles fall directly back to the re-grinding on the disc.

Cement Vertical Mill, cement making machine,

Read More

Previous

Cement Roller Press...

Previous

Cyclone Preheater...

Gongyi Fuwei Heavy Machinery Plant

cement production line,cement plant,mining machinery

Address: Mid Xinxing Road, Gongyi City,
zhengzhou, henan
China, 450000

Tel: 0086-371-60263088
Fax: 0086-371-86522382

H5响应式定制设计
26种语言,SEO营销型网站


H5/响应式/营销型企业网站; 26种语言扩展;
覆盖: 英文、法语、德语、西班牙语、葡萄牙语、俄语、阿拉伯语、波斯语、日语、韩语
了解更多